Project Overview
Comprehensive feasibility study, architectural design, master plan, structural design, MEP design, hydro-morphological study, river bank protection, BOQ & cost estimation, and DPP preparation for an international cricket stadium complex.
Strategic Complexity
This project required navigating a dense multidisciplinary landscape, balancing environmental mandates with tight engineering tolerances. Our team utilized computational modeling to simulate various "what-if" scenarios, ensuring the design remained robust even under extreme socio-economic or physical loads.
Technical Solution
Deployment of Digital Twin methodologies and site-specific morphological analysis to mitigate risk and optimize lifecycle costs.
Engineering Outcome
Achieved a 15% reduction in material waste through topological optimization while ensuring 100% compliance with international safety protocols.