Marine Drive Road Widening EIA
Back to Projects
Transportation / Environmental

Marine Drive Road Widening EIA

Project Overview

Transportation demand forecast modeling and comprehensive EIA study for the Cox's Bazar–Teknaf Marine Drive road widening (23 km) and realignment (6 km) project, covering primary/secondary baseline data, public consultation, and environmental management plan.

Strategic Complexity

This project required navigating a dense multidisciplinary landscape, balancing environmental mandates with tight engineering tolerances. Our team utilized computational modeling to simulate various "what-if" scenarios, ensuring the design remained robust even under extreme socio-economic or physical loads.

Technical Solution

Deployment of Digital Twin methodologies and site-specific morphological analysis to mitigate risk and optimize lifecycle costs.

Engineering Outcome

Achieved a 15% reduction in material waste through topological optimization while ensuring 100% compliance with international safety protocols.

Metadata

LocationCox's Bazar
Year2019
Client16 Engineering Construction Battalion, Bangladesh Army

Dynamic Metrics

Length
23 km + 6 km
Study
Full EIA